Queensland Council Guide · June 2026

Subdivision in Moreton Bay, Sunshine Coast & Noosa — 2026 Queensland Council Guide

From Moreton Bay's landmark Waraba satellite city to Sunshine Coast's new planning scheme and Noosa's strict growth controls — understanding three very different councils in the one SEQ corridor.

645,000+
Moreton Bay population forecast by 2036 — 5th fastest-growing LGA in Australia
30,000 homes
Planned for Waraba Priority Development Area across 3,480 hectares
Nil
Infrastructure charge for secondary dwellings in Noosa — unique in the region
Contents
  1. Overview
  2. City of Moreton Bay
  3. Sunshine Coast Council
  4. Noosa Council
  5. Infrastructure Charges Comparison
  6. 2026 Outlook and Key Trends

Overview

The stretch of South East Queensland from Moreton Bay north through the Sunshine Coast to Noosa represents one of Australia's most dynamic planning environments. Moreton Bay — now formally the City of Moreton Bay after its council upgrade — is among the five fastest-growing LGAs in Australia, driven by corridor growth at Caboolture, Morayfield, and Narangba. The Sunshine Coast is mid-way through a new planning scheme that will reshape how subdivision is assessed across the region. And Noosa remains one of the nation's most restrictive councils for subdivision, prioritising environmental protection and community character over housing supply.

For property owners and developers active across this corridor, the differences between adjacent councils can be stark — what is straightforward in Morayfield may be impossible in Noosa just 80 kilometres north.

City of Moreton Bay

City of Moreton Bay — Key Facts

Population: ~530,000 (forecast to exceed 645,000 by 2036). Fifth fastest-growing council area in Australia. Covers 2,037 km² from North Lakes through Caboolture to the Glass House Mountains. Key growth precincts: Caboolture South, Morayfield, Narangba, Waraba PDA, North Lakes/Mango Hill.

The City of Moreton Bay (formerly Moreton Bay Regional Council) has undergone a naming change as part of its recognition as a major urban local government. The council's planning scheme — the Moreton Bay Regional Council Planning Scheme 2016 — governs subdivision across this vast and rapidly changing LGA.

Growth Precincts: Caboolture, Morayfield, Narangba

The growth corridor running from Narangba through Morayfield to Caboolture is one of the most active residential development corridors in Australia. Three major drivers underpin this activity:

Morayfield Neighbourhood Plan 2025

The Morayfield Neighbourhood Plan, finalised August 2025, allows buildings up to 20 storeys in three core precincts: Centre North, Morayfield Central, and Morayfield Station. The plan's May 2026 expansion into Morayfield South identified four new state school sites for a population expected to reach 26,000 in that precinct alone. For subdivision developers, this represents substantial density uplift potential close to existing rail infrastructure.

For residential subdivision in Moreton Bay's growth precincts, minimum lot sizes in the General Residential Zone start from 400 m² (with frontage minimums of 10 metres in some precincts). In the Low-Medium Density Residential Zone, smaller lots of 200–300 m² may be achievable subject to design compliance. Greenfield subdivision in Caboolture South and Waraba PDA operates under the Priority Development Area framework, with development schemes setting specific subdivision criteria distinct from the standard planning scheme.

Pitfall: Infrastructure Charges in Rapidly Growing Areas

Moreton Bay infrastructure charges can significantly affect feasibility in growth precincts. The combined council and Unitywater charges for a new residential lot can reach $35,000–$45,000 or more in some precincts — always obtain a current charges estimate before committing to a subdivision project.

Sunshine Coast Council

Sunshine Coast Council — Key Facts

Population: ~380,000. Extends from Caloundra in the south to Noosa in the north (Noosa is a separate council). Key growth areas: Aura/Caloundra South, Palmview, Beerwah East. Current planning scheme: Sunshine Coast Planning Scheme 2014 (under review, with proposed new scheme under state assessment in 2026).

Sunshine Coast Council is in the midst of its most significant planning scheme review in a decade. Community consultation on the Proposed Sunshine Coast Planning Scheme closed in September 2025, with the proposed scheme then lodged with the Queensland State Government for review. As of June 2026, state government feedback is being incorporated, with formal adoption anticipated in 2026–2027. Until the new scheme takes effect, the Sunshine Coast Planning Scheme 2014 continues to govern all subdivision.

Aura Master-Planned Community and Caloundra West

The Aura master-planned community — formally known as the Caloundra South Priority Development Area — is the Sunshine Coast's most significant large-scale subdivision pipeline. Located between Caloundra and the Bruce Highway, Aura is planned to accommodate approximately 50,000 residents across 20,000 dwellings when fully built out, making it one of the largest greenfield communities on the Sunshine Coast.

The development is overseen by Stockland, with subdivision lots released in stages. Key planning features of the Aura PDA include:

Beyond Aura, Palmview (a priority development area west of Sippy Downs) and the longer-term Beerwah East PDA are also part of the Sunshine Coast's housing supply strategy — providing a pipeline of master-planned subdivision activity that will continue for many years.

Sunshine Coast Planning Scheme Amendments 2026

The proposed new Sunshine Coast Planning Scheme introduces updated minimum lot sizes, zone restructuring, and revised design codes that will materially affect what is achievable for infill and greenfield subdivision. While the full scheme is pending final adoption, town planners operating in the region are already factoring anticipated changes into pre-application advice. Key reported changes include refinements to minimum lot sizes in medium-density precincts and updated provisions for dual occupancy development.

Noosa Council

Noosa Council — Key Facts

Population: ~58,000. Separated from the Sunshine Coast Council in 2014 following a community-led campaign. Governed by Noosa Plan 2020 (Amendment 2, effective October 2025). Renowned for strict environmental protection, growth management boundary, and limited subdivision approvals.

Noosa Council sits at the opposite end of the development spectrum from Moreton Bay. It is one of the few councils in Queensland that has successfully resisted state-level pressure to significantly increase housing density, maintaining tight growth controls that reflect the community's strong desire to preserve Noosa's character, environmental values, and liveability.

Strict Subdivision Controls

The Noosa Plan 2020 (now at Amendment 2, October 2025) governs all subdivision within the shire. The plan's approach to subdivision reflects Noosa's growth management philosophy:

Noosa's Secondary Dwelling Concession

One notable concession in Noosa is that infrastructure charges are no longer payable for secondary dwellings (granny flats) within the shire — a policy that distinguishes Noosa from Moreton Bay and Sunshine Coast, where secondary dwelling charges apply. This makes granny flat construction on existing lots a more financially attractive option in Noosa than formal subdivision.

Infrastructure Charges Comparison

Infrastructure charges represent a significant cost in any subdivision project across this corridor. The Unitywater Infrastructure Charges Schedule applies to all three council areas for water and sewerage components (from 1 July 2025, average residential bills increased approximately 4.9%). Council-side charges vary significantly:

CouncilApprox. Council Infrastructure Charge (per new lot)Secondary Dwelling Charge
City of Moreton Bay$18,000–$28,000Applicable (reduced rate)
Sunshine Coast Council$15,000–$25,000Applicable
Noosa Council$12,000–$20,000Nil (waived for secondary dwellings)

Note: These are indicative ranges only and will vary by location, zone, and current charges resolution. Always verify current charges with the relevant council and Unitywater before committing to a project.

2026 Outlook and Key Trends

Across this corridor, the divergence between high-growth Moreton Bay and growth-controlled Noosa will continue to define where subdivision is viable in 2026 and beyond:

Explore Other Queensland Council Areas

Read our other Queensland subdivision council guides: